- Reconfiguration of the 120 kV primary layout of the station with new equipment bases (2 transmission line and 2 tr. fields) and 120 kV provistor design
- Construction of a new 120 kV busbar
- Complete primary rebuilding of 2 compensating fields with new equipment.
- Architectural modification of 2 compensating fields and 1 transformer field with construction of closed foundations and modification of the hydrocarbon separation.
- Complete dismantling and rebuilding of the outdoor secondary system, fitting it to the existing system.
- Construction of 2 new 25 m substation lighting and lightning protection poles.
- 20 kV primary cabling between the 120/20 kV transformer and the 20 kV encapsulated equipment.