projektek-máv-dorog-01

MÁV Dorog 25 kV Substation

Project Description

Complete technological implementation of 132 kV transformer field
Installation and technological assembly of 25 kV outdoor equipment
Installation and technological assembly of 25 kV indoor switchgear
Implementation of outdoor lighting


projektek-debrecen-deli-ip-01

Debrecen Southern Industrial Park 132/22 kV Transformer Station

Project Description

E-On Hungaria Kft’s largest greenfield investment in Hungary so far
In consortium with OVIT Zrt.
Control building’s architecture
Control electrical installation
Primary and secondary technological installation


projektek-mavir-gyor-01

MAVIR Győr Station, Installation of 5 Transformers

Project Description

Foundation of 11 new tower locations, assembly, erection, fitting and wiring of towers
Demolition of existing towers, landscaping


projektek-mav-szerencs-01

2017-2019 Reconstruction of MÁV Szerencs Substation

Projektleírás

Static reinforcement of 58 ‘Szolnok’ type towers
Production of 16.5 tons of steel required for reinforcement, with duplex protection
Installation of grid elements, replacement of fasteners


Kecskemét-Törökfái 120 kV Diversion

Project Description

Foundation of 11 new tower locations, assembly, erection, fitting and wiring of towers
Demolition of existing towers, landscaping


projektek-oroszlany-dhe-02

Oroszlány-DHE

Project Description

Static reinforcement of 58 ‘Szolnok’ type towers
Production of 16.5 tons of steel required for reinforcement, with duplex protection
Installation of grid elements, replacement of fasteners


projektek-paks-toponar-01

Paks-Toponár 400 kV

Project Description

Demolition of 18 existing H frame towers
Foundation of 18 ‘KATICA’ type towers
Reinforcement of 7 anchor tower substrate


projektek-kiskunfelegyhaza-01

Reconstruction of 120/22 kV Substation in Kiskunfélegyháza

Project Description

Reconstruction of the 120 kV primary disposition of the station with new equipment foundations (2 transmission line fields and 2 transformer fields) and 120 kV provisional design.
Construction of a new 120 kV busbar field.
Complete primary reconstruction of 2 compensation fields with new equipment.
Architectural reconstruction of 2 compensation fields and 1 transformer field with the construction of closed foundations and the reconstruction of hydrocarbon separation.
Complete demolition and rebuilding of the outdoor secondary system, fitting it to the existing system.
Construction of 2 new, 25 m high area lighting and lightning protection poles.
Designing 20 kV primary cabling between the 120/20 kV transformer and the 20 kV encapsulated equipment.


2017-2020 ÉMÁSZ Lőrinci Reconstruction

Project Description

Primary-secondary implementation of transformers I and II and Nagykáta transmission line field
Primary-secondary demolition of transformer fields I, II and III and Nagykáta transmission line field

(The image above is for illustration purposes only)


2019-2020 Reconstruction of MÁV EBES Substation

Project Description

Secondary Demolition
Secondary Technological Implementation
Control Building Renovation
(The image above is for illustration purposes only)